Bathrooms and kitchens
One bathroom opening can expose tub-wall material, floor tile and mastic together. We have every material sampled before the demolition crew arrives.
Typical cost in Long Beach
Remodels and teardowns both fall under the district’s asbestos rule, and the asbestos comes out before the other trades start. We plan the abatement around your remodel or demolition schedule.
Under the district’s rule, a structural member that carries load is the dividing line. Wrecking or taking one out is demolition, so removing a bearing wall counts even when the building stays standing.

One bathroom opening can expose tub-wall material, floor tile and mastic together. We have every material sampled before the demolition crew arrives.
Cutting into a wall for new wiring or a panel moves drywall, compound and, in some walls, plaster. Those materials are sampled before the cut.
Every demolition needs the district notice, and the small-job exceptions for renovation do not extend to demolition.
The rule covers any institutional, commercial, public, industrial or residential structure, so a storefront suite gets its survey before a tenant improvement.
Asbestos work above a certain size comes with state paperwork for the crew doing it.
At 100 square feet or more of asbestos-containing material, the employer must be registered with Cal/OSHA before day one of the work. Under that line, the employer still files a Report of Use, so no job is paperwork-free. Registration is valid for one year, so ask to see a current one.
For a demolition in Long Beach, the district notice goes in first. A copy then goes to the Development Permit Center when you apply for the permit.

Samples come first in asbestos testing. More is on the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 661-6166