Renovation and Demolition Abatement in Long Beach

Typical cost in Long Beach

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

Remodels and teardowns both fall under the district’s asbestos rule, and the asbestos comes out before the other trades start. We plan the abatement around your remodel or demolition schedule.

Under the district’s rule, a structural member that carries load is the dividing line. Wrecking or taking one out is demolition, so removing a bearing wall counts even when the building stays standing.

Request a free quote
Bathroom opened for a remodel, with the tub-surround wall cut out to the studs, pink and teal tile on one side, floor tile partly lifted and plastic hung at the left.

What we clear before the work

Bathrooms and kitchens

One bathroom opening can expose tub-wall material, floor tile and mastic together. We have every material sampled before the demolition crew arrives.

Wiring and panel work

Cutting into a wall for new wiring or a panel moves drywall, compound and, in some walls, plaster. Those materials are sampled before the cut.

Whole-house teardowns

Every demolition needs the district notice, and the small-job exceptions for renovation do not extend to demolition.

Storefronts and small suites

The rule covers any institutional, commercial, public, industrial or residential structure, so a storefront suite gets its survey before a tenant improvement.

What a hired crew has to hold

Asbestos work above a certain size comes with state paperwork for the crew doing it.

Cal/OSHA registration

At 100 square feet or more of asbestos-containing material, the employer must be registered with Cal/OSHA before day one of the work. Under that line, the employer still files a Report of Use, so no job is paperwork-free. Registration is valid for one year, so ask to see a current one.

Teardown permits

For a demolition in Long Beach, the district notice goes in first. A copy then goes to the Development Permit Center when you apply for the permit.

Section of wall cut open around an electrical panel, with plastic sheeting taped around the opening beside a white door and a wood floor.

Samples come first in asbestos testing. More is on the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 661-6166

Call (562) 661-6166